A Shelf from Scraps, a Lamp That Wouldn't Light
원문: 한옥 셀프 리모델링 기록 #61 (벽면 정밀 퍼티 및 보수 · 창틀 목재 선반 제작 · 실내외 조명 설치)
Day seventy. A round number that invited stock-taking: the work has shifted from building to perfecting.
Putty, by personality. The master bedroom’s pre-paint refinement ran all day, deploying the two putties by their now well-documented characters:
- Acrylic filler into the movement zones — the wide seams where ceiling meets wall, corner gaps, anywhere the house’s seasonal breathing will test the repair. It flexes; Handycoat there would crack by winter.
- Handycoat (thinned slightly with water for spreadability) over the rough faces — cement posts, torn-wallpaper scars, the ceiling scarred by molding removal. It sands like a dream; filler doesn’t.
- Staple dimples in plasterboard, tack holes around the attic ladder — filled, the wall’s whole biography erased before paint retells it in white.
The cautionary photo in today’s records: a patch where yesterday’s filler went on thick — cracked and lifting by morning. Both materials speak the same law: thin coats, applied twice, beat one generous coat every time.
The scrap shelf. From the leftover lumber pile, a small win: a fitted wooden shelf built into the annex window’s inner recess — frame matched to the window trim, timber tone matched to the house. A dead corner became a place for a book and a cup. The waste stream keeps funding the finish work.
Lighting’s long tail. Three exterior lamps up, four living-room downlights in — and then the day’s anticlimax: the main ceiling fixture, after hours of patient wiring and mounting, refused to light. Diagnosis: factory defect, not our wiring (the meter confirmed). Replacement ordered. Lighting, we’ve accepted, is not an install day — it’s an install era.





Originally logged in Korean on May 8, 2026 — read the original. Translated and edited by the brothers who did the work.